Case details
The desulphurized gypsum obtained from the flue gas desulphurization equipment is delivered to the gypsum warehouse by conveyor belt (belt stacker). In order to ensure safety, it is necessary to use two radar level meters at the end of the conveyor belt to monitor the pile height. When the pile height reaches the specified position, the stacker moves forward.
WhatsApp 173-6757-2262
17367572262
South of Puhui Street, west of Guangsheng East Road, High tech Zone, Fengnan District, Tangshan City, Hebei Province
Friendship link
Tips
Submitted successfully
Determine