Case details
During smelting, the charge materials such as iron ore, flux and coke need to be transported from the silo to the top of the blast furnace and loaded by conveyor belt or skip truck. In order to ensure the reasonable distribution of ore and coke beds, it is necessary to measure the material level.
WhatsApp 173-6757-2262
17367572262
South of Puhui Street, west of Guangsheng East Road, High tech Zone, Fengnan District, Tangshan City, Hebei Province
Friendship link
Tips
Submitted successfully
Determine